PB30th Ward
#TheNew30thWard Participate in the 30th Ward Participatory Budgeting Process!
Budget rules
- Select at least 1 projects you want and vote according to your preferences to define the budget.
Total budget
$500,000
0%
0%
Assigned:
$0
Vote
Maximum budget exceeded
This project exceeds the maximum budget and can not be added. If you want, you can delete a project you have already selected, in order to be able to vote again according to your preferences.
Confirm vote
These are the projects you have chosen to be part of the budget.
If you change your mind, you can change your vote later.
Pedestrian Safety Package - #2 // Paquete de Seguridad Para la Comunida - #2
Budget
$120,000
Reference: -PROJ-2023-11-80
- One Pedestrian Island to be installed in the 30th ward. ($75k)
- Residential Street Bump-Outs at 3 different locations throughout the ward. ($15k per bump-out.)
- Note: Locations to be determined with guidance from the Chicago Department of Transportation.
---
- Se instalará una isla peatonal en el distrito 30. ($75 mil)
- Desplazamientos en calles residenciales en 3 ubicaciones diferentes a lo largo del barrio. ($15 mil por golpe).
- Nota: Las ubicaciones se determinarán con la orientación del Departamento de Transporte de Chicago.
Share: